Springs for the Aerospace Industry G&O Springs

When it comes to the
design or specification
of your springs, why not
ask the professionals?

 

OTIF

On Time in Full Delivery

A measure of how well a supplier matches the planned delivery requirement of the customer. The ability to deliver products on time is fundamental to customer satisfaction. 100% delivery must be achieved without unnecessary additional costs such as special deliveries, overtime payments, increases in stocks, scrap or rework costs. OTIF is a function of good plant performance which in turn is an indication of good management. Good plant performance is demonstrated when production flows through the plant without interruptions.

No of Planned – No of Incorrect

Deliveries Deliveries

OTIF =

________________________________

x 100%

No of planned deliveries

· Units : Percentage %

· Data Required :

o Customer Delivery Schedule

o Actual delivery history

This measure is now aligned to SC21 and is shown as a 12 month average

Click on the image above to expand


Latest G&O Performance Metrics:
  • OTIF = 95.59        PPM = 1772        PPOH = 11.08        VAPP = £48105        Stock Turns = 12.57        Floor Space Utilistation = £1640        

© Copyright 2008 G&O Springs Limited. Tel: +44(0)1527 523764

Contact Us
Website Design By The Blue Cube