Springs for the Aerospace Industry G&O Springs

When it comes to the
design or specification
of your springs, why not
ask the professionals?

 

Supply Methods

KANBAN supply methods are very close to our heart here at G & O. We currently supply over 150 different parts using KANBAN and similar methods.

The first thing to think about when trying to improve supply performance is to understand both the demand (accounting for peaks and troughs) but also to understand the value stream for the part. Once these factors are known the relevant system can be implemented, some high value or high volume items demand multiple KANBANs with inventory (WIP) at strategic points throughout the process whilst others just demand 1 weeks buffer stock, one size never fits all!

We also offer Vendor Managed Inventory where the stock held on site at our customers remains the property of G&O until used.

One thing we are sure of is that this type of system not only reduces inventory throughout the supply chain, thus reducing cost but that it almost guarantees 100% delivery performance.

We operate these systems with both our customers and our suppliers, if you would like to learn more please contact us so we can discuss your requirements in more detail

 


Latest G&O Performance Metrics:
  • OTIF = 95.59        PPM = 1772        PPOH = 11.08        VAPP = £48105        Stock Turns = 12.57        Floor Space Utilistation = £1640        

© Copyright 2008 G&O Springs Limited. Tel: +44(0)1527 523764

Contact Us
Website Design By The Blue Cube